More progress

Another great day!  Tar paper is on the roof and one side of the roof is now shingled.  The wall above the front door was closed in and more of the front porch was built.  The stones I picked out last night were delivered and some were installed under the porch today!  Looks like I made a good decision, even in the dark.  The porch floor was also installed which closed in the basement bathroom underneath it.  The roof was built over the fireplace and the gas meter was set in place.  They also started framing the back patio and hauled in some rock.  I'm meeting with the plumber tomorrow afternoon to go over the plans and he is going to start next week!

Shingles on the roof.

Front porch and stones.

Stone and porch sub-floor.

Stone and porch sub-floor.

Back patio.

Front porch.

Front porch.

Back patio.

Stone pile.
 
Gas meter.

 
Roof over fireplace.