Thursday, August 7, 2014

Forming and Reinforcement

The steps are formed!  They did some more forming in some other areas as well.  There is rebar in the steps and coming out of the existing concrete for the new patio step.  There are also holes drilled in the side of the existing patio for more reinforcement that will go in tomorrow I suspect.  More gravel down and compacted and the downspouts are hooked back up to the drain.  Still looking great!

Stairs formed and downspouts reattached

downspouts and steps

rebar in steps

steps

rebar in existing patio and new patio door step

curved step

steps view from top level

pathway to pool

holes in side of existing concrete

view of steps from inside

view of where pool will be from inside