I meant to post this before leaving for vacation but never got around to it. This all happened before leaving. I'll try posting some videos in another post as well as an update showing what it looked like when I got home. It was definitely an exciting day when the installation happened. There was a lot going on, a lot of people, and it was planned and executed perfectly. The excavator showed up around 8am and the hole was dug in just a few hours. The pool showed up at 11 and looked much bigger than I thought. The color is perfect... gray with blue shiny flecks. It's going to look great. It was unloaded without any problems. They lifted it off the truck, set it down, and then lifted it down in the hole. I did get to see a truck of water get dumped the following morning before leaving for vacation.
Getting ready for the excavator.
View of firepit from upstairs.
Excavator
Digging the hole
More digging
More digging
Hauling away the dirt
The hole
The hole
The hole
The pool on the truck
A lot going on
Adding gravel to the hole
Spreading gravel
Sealed the concrete on the firepit.
Finished firepit concrete.
Finished firepit concrete.
Mom and Dad posing by the pool
Me posing by the pool
Off the truck
Lowering into the ground
Lowering into the ground
Lowering into the ground
Another visitor
Pool in the ground
Spreading gravel
Trying it out
View from inside the house
View from inside the house
Water truck
No comments:
Post a Comment