Thursday, January 24, 2013

Wood, Tile, & Paint

More of the kitchen tile is down and basement is completely tiled.  The fireplace tile is up as well and it looks GREAT!  The wood floors have been put down in the dining room and living room.  Ceilings have been painted and the trim will be going up on Monday.  On Tuesday, I have appointments with the trim guy to plan the ledge around the basement walls, the closet organization/bathroom hardware guy, and the audio system guy.  It's all coming together fast now.

Front porch.

Front of house.

Dining room wood floor.

Living room wood floor.

Fireplace tile.

Fireplace tile.

Kitchen tile.

Basement tile.

Painted ceilings.

Painted ceilings.

1 comment:

  1. Select a broom with a soft, plush head. A broom that utilizes static electricity for maximum dirt lifting is the best choice.
    carpet installation

    ReplyDelete