Thursday, February 14, 2013

More finishing touches...

More lights were installed today including the outside lights and lights under the cabinets.  The pole was installed on top of the concrete slab that was poured on Monday at the rear garage door.  Most of the carpet pad is down and the rolls of carpet are in the rooms.  The niche is in the master shower and concrete board is up.  Today, I got the glass shelves for the bar picked out and continued negotiations with the guy installing the theater equipment.  Tomorrow I meet with a guy who is measuring for shades.  Only a few finishing touches left!  Closing 2 weeks from tomorrow!